The key to efficiency
Especially with the advanced function "Creation of tool lists with setup sheet", Ituwa Kogyo was able to drastically reduce the preparation time for tools in diversified small batch production. In addition, the "data transfer of measurement results to processing machines" function has successfully reduced set-up times, which has significantly increased machine utilization.
Significant time savings
With the boring bar, the set-up time was reduced to 10 minutes for an experienced operator and 30 minutes for an inexperienced operator. With the »venturion« from ZOLLER, the entire process was reduced to around 5 minutes, regardless of experience. The most time-consuming set-up time for machining parts used to be 6 hours! With the introduction of the »venturion«, this time was reduced to around 30 minutes. This was a significant reduction in working time, mainly due to the more efficient setup of multiple boring bars.